1 |
ENGINEERING |
Need Based Maintenance Of Track A Software Module For Effective Use Or Results Of Track Recording Cars And Related Information |
SPCE |
AMP02_2_2004 |
565 |
Yes |
2 |
ENGINEERING |
Working of Suburban section with over aged infrastructure of sealdah division |
PCE |
AMP04_01_2005 |
669 |
Yes |
3 |
OPERATING |
Strategic Talent Management Plan for Running Staff in IR |
SPEE |
AMP_06_01_2009 |
A0922 |
Yes |
4 |
SIGNAL AND TELECOMUNICATION |
Real time monitoring of automatic signaling section by station master through display panel in BRC-ST of Western Railway |
SPST |
AMP-01-2010-02 |
A1002 |
Yes |
5 |
ENGINEERING |
Performance Contract for Energy Efficiency Measures - A Case study of Rail Bhawan |
SPEE |
MDP01_6_2004 |
M528 |
Yes |
6 |
SIGNAL AND TELECOMUNICATION |
How to make Railnet More Efficient for Use as a Management Tool in Day to Day Working in Railways |
SPST |
MDP05_5_2005 |
M635 |
Yes |
7 |
ELECTRICAL |
Energy efficient driving technique of EMUs with a view to reduce operating cost in MSB-TBM Section of Chennai division, SR |
SPEE |
MDP03_4_2006 |
M0613 |
Yes |
8 |
ENGINEERING |
GSM BASED Automatic Flood Water Monitoring System for Bridges |
SPCE |
MDP01_1_2007 |
M0701 |
Yes |
9 |
ENGINEERING |
Rehabilitation of Major Bridge No.37 on Kharagoda river between Patdi and Kharagoda stations at VG-KOD BG Section on Ahmedabad Division of Western Railway |
SPCE |
MDP_03_02_2009 |
M0913 |
Yes |
10 |
COMMERCIAL |
Work Study based safai working rules for Railway Station |
PCM |
MDP-05-2010-01 |
M1020 |
Yes |
11 |
ENGINEERING |
Effective water management at Bilaspur Railway Station – A case studySaving Projected 7 lakh liter water per day = Rs. 1.81 crores pa |
SPMGT/SPCE/SPME |
MDP 06/13 |
- |
Yes |
12 |
ENGINEERING |
Enhance the average speed in saturated section of Hyderabad Division |
SPCE/SPTM |
MDP 04 /14 |
- |
Yes |
13 |
S & T |
Reduction in carbon emission through networking of power control management system .. |
SPST |
MDP 02/15 |
- |
Yes |